• 20.04.10
    Basecent.com to appear on MySuccess.bg forum, which will be held this weekend, the 24th and 25th of April in Sofia, Bulgaria. The event itself is organized by Enterprise Magazine in cooperation with CEED Bulgaria. "ENTERPRISE magazine, ... Read More
  • 13.04.10
    Basecent has released the monthly report for March. The report features a new design and a presentation of each new member. To take a closer look at the report please use the link below: http://support.basecent.com For more informatio ... Read More
  • 11.04.10
    basecent.com introduced the personal domain name for each registered company. This innovation means two things: 1. Simple access to each microsite 2. Personalization Each microsite, although part of the basecent network, is now complet ... Read More
  • 15.03.10
    Dear Customers, Basecent Corp. introduces the personal IT assistant for each paid microsite. Each member, with a paid microsite (continental or world users) will automatically be assigned a personal IT assistant who will take care of al ... Read More
  • Back in 1932 a joint-stock company Jugo-tanin d.d. was founded. Besides the in-country capital the French firm TT Tanin's Rey had also joined the establishment. From years 1924-1925 the factory was in building, and regular manufacturing sta
  • After finishing the products, an overall quality inspection (100%) has to be performed to verify the compliance of the goods. Normally, a 100% dimensional check is performed (for brake discs/bearing boxes) and a 10% dimensional check for ot
  • Phase control is performed regularly and on a daily basis according to the check-point control plans which are found on each measure report, issuing the scope and art of control level for each phase. First article inspection is performed wi
  • Upon receiving the basic materials for brake disc manufacturing, all received goods must be inspected by the QA/QC (Quality Assurance/Quality Control) Dept. on the basis of certificates 3.1B for the castings and the forgings as well. All ma
  • Development / posted by Kovis d.o.o.(Kovis d.o.o.) / 26.04.10

    The new principles that reflect the experience and the know-how of the development team are now implemented in the design of the new Kovis products. By implementing the newest CAD/CAM tools, a new approach has been constructed to directly i
  • Production / posted by Kovis d.o.o.(Kovis d.o.o.) / 26.04.10

    The production department is divided into 3 production halls (A, B and C). In the hall A all the products are prepared before shipping. The welding section in the hall A operates with MIG/MAG welding techniques. This is done to fulfil the t
  • The production activity of Belotex 95 JSC is organized in 3 workshops – two weaving and one for ready-made clothes located in the town of Zlatograd and the village of Startsevo, at 8 km from Zlatograd. A preparatory division works with th
  • QUALITY / posted by Unitehna OZ(Unitehna z.o.o.) / 24.04.10

    Cooperative UNITEHNA and its co-operators developed and implemented a system of quality.
    The Cooperative, which has experts, who ensure the checking, the supervision, the control and the development of the device of quality, now controls it
  • Air Canada,
    Air China,
    Air New Zealand,
    ANA,
    Asiana Airlines,
    Austrian Airlines,
    Blue 1,
    bmi,
    Croatia Airlines,
    Continental Airlines,
    Egypt Air,
    LOT Polish Airlines,
    Lufthansa,
    SAS Scandinavian Airlines,
    Shanghai Airlines,
    Singapore Airli
  • Client: Boni Oborot

    - Technological and technical projects of six plants, including meat production and processing plants;

    Client: Priceklanica - Dobrich / Bulgaria /

    - Technological and technical projects of a new slaughterhouse for wh
  • Back in 1932 a joint-stock company Jugo-tanin d.d. was founded. Besides the in-country capital the French firm TT Tanin's Rey had also joined the establishment. From years 1924-1925 the factory was in building, and regular manufacturing sta
  • After finishing the products, an overall quality inspection (100%) has to be performed to verify the compliance of the goods. Normally, a 100% dimensional check is performed (for brake discs/bearing boxes) and a 10% dimensional check for ot
  • Phase control is performed regularly and on a daily basis according to the check-point control plans which are found on each measure report, issuing the scope and art of control level for each phase. First article inspection is performed wi
  • Upon receiving the basic materials for brake disc manufacturing, all received goods must be inspected by the QA/QC (Quality Assurance/Quality Control) Dept. on the basis of certificates 3.1B for the castings and the forgings as well. All ma
  • Development / posted by Kovis d.o.o.(Kovis d.o.o.) / 26.04.10

    The new principles that reflect the experience and the know-how of the development team are now implemented in the design of the new Kovis products. By implementing the newest CAD/CAM tools, a new approach has been constructed to directly i
  • Production / posted by Kovis d.o.o.(Kovis d.o.o.) / 26.04.10

    The production department is divided into 3 production halls (A, B and C). In the hall A all the products are prepared before shipping. The welding section in the hall A operates with MIG/MAG welding techniques. This is done to fulfil the t
© Copyright 2009-2018 Basecent.com. All Rights Reserved.